Skip to main content
Log in

Producer’s behavior analysis in an uncertain bicriteria AGV-based flexible jobshop manufacturing system with expert system

  • ORIGINAL ARTICLE
  • Published:
The International Journal of Advanced Manufacturing Technology Aims and scope Submit manuscript

Abstract

Here, an approach for finding an optimal path in a flexible jobshop manufacturing system considering two criteria of time and cost is proposed. A network is configured in which the nodes are considered to be the shops with arcs representing the paths among the shops. An automated guided vehicle functions as a material handling device through the manufacturing network. To account for uncertainty, time is considered to be a triangular fuzzy number and apply an expert system to infer the cost. The expert system based on fuzzy rule backpropagation network to configure the rules for estimating the cost under uncertainty is proposed. A multiple linear regression model is applied to analyze the rules and find the effective rules for cost estimation. The objective is to find a path minimizing an aggregate weighted unscaled time and cost criteria. A fuzzy dynamic programming approach is presented for computing a shortest path in the network. Then, a comprehensive economic and reliability analysis is worked out on the obtained paths to find the optimal producer’s behavior. Finally, an application of the model is illustrated by a numerical example. The results show the effectiveness of our approach for finding an optimal path in a manufacturing system under uncertainty.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. Abdel-Malek L, Wolf C (1991) Evaluating flexibility of alternative FMS designs—a comparative measure. Int J Prod Econ 23(1):3–10

    Article  Google Scholar 

  2. Abdi H, Valentin D, Edelman B, O’Toole AJ (1996) A Widrow–Hoff learning rule for a generalization of the linear auto-associator. J Math Psychol 40:175–182

    Article  MATH  Google Scholar 

  3. Aized T (2009) Modelling and performance maximization of an integrated automated guided vehicle system using coloured Petri net and response surface methods. Comput Ind Eng 57(3):822–831

    Article  Google Scholar 

  4. Babuska R (1998) Fuzzy modeling for control. Kluwer, Norwell, MA

    Book  Google Scholar 

  5. Ball MO, Lin FL (1993) A reliability model applied to emergency service vehicle location. Oper Res 41(1):18–36

    Article  MATH  Google Scholar 

  6. Ben-Arieh D, Qian L (2003) Activity-based cost management for design and development stage. Int J Prod Econ 83:169–183

    Article  Google Scholar 

  7. Bortolan G, Degani R (1985) A review of some method for ranking fuzzy subsets. Fuzzy Set Syst 15:1–19

    Article  MathSciNet  MATH  Google Scholar 

  8. Brill PH, Mandelbaum M (1989) On measures of flexibility in manufacturing systems. Int J Prod Res 27(5):747–756

    Article  Google Scholar 

  9. Browne J, Dubois D, Rathmill K, Sethi SP, Stecke KE (1984) Classification of flexible manufacturing systems. FMS Mag 2(2):114–117

    Google Scholar 

  10. Carbone R (1974) Public facilities location under stochastic demand. Infor 12(3):261–270

    MathSciNet  MATH  Google Scholar 

  11. Cavalieria S, Maccarroneb P, Pinto R (2004) Parametric vs. neural network models for the estimation of production costs: a case study in the automotive industry. Int J Prod Econ 91:165–177

    Article  Google Scholar 

  12. Charnes A, Cooper W (1959) Chance–constraint programming. Manag Sci 6(1):73–79

    Article  MathSciNet  MATH  Google Scholar 

  13. Chen SH, Hsieh CH (2000) Representation, ranking, distance, and similarity of L–R type fuzzy number and application. Aust J Intell Process Syst 6(4):217–229

    Google Scholar 

  14. Das K, Baki MF, Li X (2009) Optimization of operation and changeover time for production planning and scheduling in a flexible manufacturing system. Comput Ind Eng 56(1):283–293

    Article  Google Scholar 

  15. Eklin M, Arzi Y, Shtub A (2009) Model for cost estimation in a finite-capacity stochastic environment based on shop floor optimization combined with simulation. Eur J Oper Res 194(1):294–306

    Article  MATH  Google Scholar 

  16. EViews.com

  17. Gen M, Lin L, Zhang H (2009) Evolutionary techniques for optimization problems in integrated manufacturing system: state-of-the-art-survey. Comput Ind Eng 56(3):779–808

    Article  Google Scholar 

  18. Gupta D, Buzacott JA (1989) A framework for understanding flexibility of manufacturing systems. J Manuf Syst 8(2):89–97

    Article  Google Scholar 

  19. Hsueh CF (2010) A simulation study of a bi-directional load-exchangeable automated guided vehicle system. Comput Ind Eng 58(4):594–601

    Article  Google Scholar 

  20. Keeney R, Raiffa H (1976) Decision with multiple objectives: preference and value tradeoffs. Wiley, New York

    Google Scholar 

  21. Kim K, Park KS (1990) Ranking fuzzy numbers with index of optimism. Fuzzy Set Syst 35:143–150

    Article  Google Scholar 

  22. Klir GJ, Yuan B (1995) Fuzzy sets and fuzzy logic: theory and applications. Prentice-Hall, New York

    MATH  Google Scholar 

  23. Kumar NS, Sridharan R (2009) Simulation modelling and analysis of part and tool flow control decisions in a flexible manufacturing system. Robotics Comput Int Manufact 25(4–5):829–838

    Article  Google Scholar 

  24. Kumar V (1987) Entropic measures of manufacturing flexibility. Int J Prod Res 25(7):957–966

    Article  Google Scholar 

  25. Lee KL, Huang WC, Teng JY (2007) Locating the competitive relation of global logistics hub using quantitative SWOT analytical method. Qual Quant 43(1):87–107

    Article  Google Scholar 

  26. Luis M, Antonio GM (1989) A subjective approach for ranking fuzzy numbers. Fuzzy Set Syst 29:145–153

    Article  MATH  Google Scholar 

  27. Mahdavi I, Nourifar R, Heidarzade A, Mahdavi-Amiri N (2009) A dynamic programming approach for finding shortest chains in a fuzzy network. Appl Soft Comput 9(2):503–511

    Article  Google Scholar 

  28. McKim RA (1993) Neural network applications to cost engineering. Cost Eng 35:31–35

    Google Scholar 

  29. Miettinen K, Eskelinen P, Ruiz F, Luque M (2010) NAUTILUS method: an interactive technique in multiobjective optimization based on the Nadir point. Eur J Oper Res 206(2):426–434

    Article  MathSciNet  MATH  Google Scholar 

  30. Mostafaee A, Saljooghi FH (2010) Cost efficiency measures in data envelopment analysis with data uncertainty. Eur J Oper Res 202(2):595–603

    Article  MATH  Google Scholar 

  31. Niazi A, Dai JS, Balabani S, Seneviratne L (2006) Product cost estimation: technique classification and methodology review. J Manuf Sci Eng 128:563–575

    Article  Google Scholar 

  32. Nolan A (1998) An intelligent system for case review and risk assessment in social services. AI Mag 19(1):39–46

    Google Scholar 

  33. Pedrycz W (1994) Why triangular membership functions? Fuzzy Set Syst 64:21–30

    Article  MathSciNet  Google Scholar 

  34. Qian L, Ben-Arieh D (2008) Parametric cost estimation based on activity-based costing: a case study for design and development of rotational parts. Int J Prod Econ 113(2):805–818

    Article  Google Scholar 

  35. Saaty TL (1980) The analytic hierarchy process. McGraw-Hill, New York

    MATH  Google Scholar 

  36. Sadeghpour Gildeh B, Gien D (2001). La distance-Dp,q et le cofficient de corrélation entre deux variables aléatoires floues. Actes de LFA’2001, 97–102, Monse, Belgium

  37. Schniederjans MJ, Garvin T (1997) Using the analytic hierarchy process and multi-objective programming for the selection of cost drivers in activity based costing. Eur J Oper Res 100:72–80

    Article  MATH  Google Scholar 

  38. Shehab EM, Abdalla HS (2001) Manufacturing cost modeling for concurrent product development. Robotics Comput Int Manufact 17:341–353

    Article  Google Scholar 

  39. Shin M, Mun J, Jung M (2009) Self-evolution framework of manufacturing systems based on fractal organization. Comput Ind Eng 56(3):1029–1039

    Article  Google Scholar 

  40. Shiode S, Drezner Z (2003) A competitive facility location problem on a tree network with stochastic weights. Eur J Oper Res 149(1):47–52

    Article  MathSciNet  MATH  Google Scholar 

  41. Slack N (1987) The flexibility of manufacturing systems. Int J Prod Oper Manag 7(4):35–47

    Article  Google Scholar 

  42. Stewart W, Golden B (1983) Stochastic vehicle routing: a comprehensive approach. Eur J Oper Res 14(4):371–385

    Article  MATH  Google Scholar 

  43. Suresh NC (1991) An extended multi-objective replacement model for flexible automation investments. Int J Prod Res 27(9):1823–1844

    Article  Google Scholar 

  44. Teng J-Y (2002) Project evaluation: method and applications. National Taiwan Ocean University, Keelung

    Google Scholar 

  45. Turban E, Aronson J (1998) Decision support systems and intelligent systems. Prentice-Hall, London

    Google Scholar 

  46. Verlinden B, Duflou JR, Collin P, Cattrysse D (2008) Cost estimation for sheet metal parts using multiple regression and artificial neural networks: a case study. Int J Prod Econ 111(2):484–492

    Article  Google Scholar 

  47. Wang HS (2007) Application of BPN with feature-based models on cost estimation of plastic injection products. Comput Ind Eng 53(1):79–94

    Article  Google Scholar 

  48. Wang Q (2007) Artificial neural networks as cost engineering methods in a collaborative manufacturing environment. Int J Prod Econ 109(1–2):53–64

    Article  Google Scholar 

  49. Weiss N, Kulikowski I (1991) Computer systems that learn. Morgan-Kaufman, California

    Google Scholar 

  50. Yao DD, Pei FF (1990) Flexible parts routing in manufacturing systems. IIE Trans 22(1):48–55

    Article  Google Scholar 

  51. Zadeh LA (1965) Fuzzy sets. Inf Control 8:338–353

    Article  MathSciNet  MATH  Google Scholar 

  52. Zadeh LA (1996) Fuzzy logic = computing with words. IEEE Trans Fuzzy Syst 4:103–111

    Article  Google Scholar 

  53. Zadeh LA (1999) From computing with numbers to computing with words—from manipulation of measurements to manipulation of perceptions. IEEE Transact Circuit Syst 45:105–119

    Article  MathSciNet  Google Scholar 

  54. Zhang YF, Fuh JYH (1998) A neural network approach for early cost estimation of packaging products. Comput Ind Eng 34:433–450

    Article  Google Scholar 

  55. Zimmermann HJ (1996) Fuzzy set theory and its applications, 3rd edn. Kluwer, New York

    Book  MATH  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Nezam Mahdavi-Amiri.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Fazlollahtabar, H., Mahdavi-Amiri, N. Producer’s behavior analysis in an uncertain bicriteria AGV-based flexible jobshop manufacturing system with expert system. Int J Adv Manuf Technol 65, 1605–1618 (2013). https://doi.org/10.1007/s00170-012-4283-0

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s00170-012-4283-0

Keywords

Navigation